0
%
Menu
Back to map

Navigating the "lithium triangle"

From exploration to site development, construction and operations

A continuous dialogue with local communities

Minimal environmental impact 

A model laboratory

A challenging construction

A model laboratory

Pioneering lithium extraction at 4,000 metres above sea level

Prior to the construction of the full-scale plant, a pilot plant was set up on the site to continue the research begun ten years earlier at the Trappes research and development centre. Eramet Ideas. as it is known, also provided training for a number of Argentinian engineers and technicians.

11,000km

The pilot plant endured a lengthy journey of 11,000 km

Read moreNext